MEZITLI 3 OCAK LIGHT RAIL SYSTEM SUBWAY LINE CONSTRUCTION and ELECTROMECHANICAL SYSTEMS SUPPLY, INSTALLATION and COMMISSIONING WORK
Administration Name |
: |
Mersin Metropolitan Municipality Department of Transportatıon |
Location |
: |
Mersin |
Date of Contract |
: |
04.10.2021 |
Completion Date |
: |
|
Project Details |
: |
All cut and cover (about 8070 m long)
Single tub tbm (about 4880 m long)
11 underground stations
|
RESTORATION OF REINFORCED CONCRETE PIPES IN THE ASIAN REGION (3)
Administration Name |
: |
General Directorate of Istanbul Water and Sewerage Administration |
Location |
: |
İstanbul |
Date of Contract |
: |
12.10.2017 |
Completion Date |
: |
|
Project Details |
: |
: 30.300 m Ø 2500 – Ø 700 mm dia. Steel Pipe pipeline and engineering structures of pipeline
13.250 m Ø 1200 mm-1800 mm steel pipe transmission line and engineering structures of transmission line
|
EUROPEAN 1. REGION 2. SECTION SEWER, DRAINAGE CHANNEL AND STREAM IMPROVEMENT CONSTRUCTION
Administration Name |
: |
General Directorate of Istanbul Water and Sewerage Administration |
Location |
: |
İstanbul |
Date of Contract |
: |
11.10.2016 |
Completion Date |
: |
|
Project Details |
: |
: 81.866 m Q300– 2400 mm dia. Concrete Pipe Construction
400.000 m³ channel excavation
|
KUMRU-(KORGAN-ÇAMICI) INT. PROVINCIAL ROAD KM: 0+000—24+500
Administration Name |
: |
General Directorate of Highways - Regional Directorate of Samsun |
Location |
: |
Samsun |
Date of Contract |
: |
8.09.2016 |
Completion Date |
: |
|
Project Details |
: |
: 1.600.000 m3 Excavatıons
500.000 m3 Filling
60.000 Ton Plent Mix Base
120.000 Ton Plent Mix Subbase
|